top of page
Screen Shot 2021-01-20 at 4.00.33 PM.png

1. DEFINE

Identifying the pain point/ problem that needs to be addressed and define strategies and requirements to fulfill that need.

Screen Shot 2021-01-20 at 4.14.26 PM.png

7. COMMUNICATE

Communicate the research, test, findings and recommendations for teams to collaboratively decide how to proceed further.

Screen Shot 2021-01-20 at 5.17.18 PM.png
Screen Shot 2021-01-20 at 2.57.05 PM.png

2. STRATEGIZE

Collaborate and construct a plan laying down timelines, milestones and gather all necessary information.

3. PROTOTYPE

Develop a prototype that consists all features required for MVP (Minimum Viable Product). This helps in testing out the new designs and validating existing concepts.

Screen Shot 2021-01-20 at 2.58.37 PM.png

4. TEST

Conduct usability sessions to collect user data on their interactions with a product, quantitative data and qualitative data.

Screen Shot 2021-01-20 at 3.10.09 PM.png

5. ANALYZE

Analyze the tests gives insight into the product's efficiency and how effectively a user is able to complete tasks on it.

Screen Shot 2021-01-20 at 3.21.27 PM.png

6. ITERATE

Design iterations after testing/analyzing help improve the overall efficiency and get the users the most optimized state of the product. Testing is done if changes that impact the entire flow are done.

Screen Shot 2021-01-20 at 4.12.48 PM.png
bottom of page